Green Civil rented a JMS-20-MDT from Grydale Rental to work alongside a Vermeer Trencher to manage the dust creating from completing trenching work in Sydney.
Greenbank Sewer Rising Main Project
Grydale2020-05-07T18:29:34+10:00The Greenbank Sewer Rising Main project was undertaken by Diona in November 2019, for the Logan Water Infrastructure Alliance and involved the installation of 5.6 kilometres of sewer rising main pipeline. They hired a JMS-20-MDT (Diesel, Track) dust collector from Grydale Rental to manage the silica dust created as a result of trenching through sandstone.
Bulk Storage Facility
Grydale2020-05-07T14:33:38+10:00Our client has two 8000m2 sheds that store zinc and copper concentrate before being distributed to customers across the globe. Zinc and Copper dust needed to be fully contained within each shed to protect against spillage, avoid cross contamination and ensure environmental security. With the added challenge of having the port directly opposite Townsville, EHP limits placed on the client meant no visible dust was allowed to escape each building. Grydale were commissioned to design, manufacture and install a JMS 48 F-Series Dust Collection System for each storage shed (zinc and copper) to manage dust created through loading and unloading product.
Crushing Plant Dust Extraction System
Grydale2020-05-07T18:27:58+10:00Our clients’ site expansion works, included a tender for a dust extraction system to manage dust created by two secondary and tertiary cone crushers and three screening plants. Grydale were awarded the contract to design, manufacture and install a Grydale JMS 48 F-Series Dust Extraction System. This unit provided 38,000m3/hr of air flow at -2.0kPA, which offered the capacity to extract dust from the two secondary and tertiary cone crushers and three screening plants.
Bulk Storage Shed Loading Facility
Grydale2020-05-07T18:28:42+10:00Our client has two 8000m2 sheds that store zinc and copper concentrate before being distributed to customers across the globe. Zinc and Copper dust needed to be fully contained within each shed to protect against spillage, avoid cross contamination and ensure environmental security. Grydale were commissioned to design, manufacture and install a JMS 48 F-Series Dust Collection System for each storage shed (zinc and copper) to manage dust created through loading and unloading product.